Shi Yomi district, Arunachal Pradesh
How is a hanging thatch ceiling installed in Shi Yomi district?
A hanging finish is set out from a support line above the room. The installer fixes the selected backing to the designed support so that the decorative fibres fall downwards to the agreed level.

Reviewing the hanging detail
Draw one section through the backing and the lowest strand. Check the mock-up with the lighting switched on, then confirm the spacing and end treatment. Have the relevant trades agree on access to equipment before closing the ceiling.
What should be checked before the pattern repeats?
Look for uneven drop, abrupt joins and strands that screen an access point. Agree on the finished sample with the installer and keep the product reference with the room drawings.
Preparing a ceiling brief for Shi Yomi district
For an enquiry near Barbo or Tasum, identify the room on a marked photograph. Include mock-up of a joint and free edge. If the delivery entrance is closer to Pak, send that map pin separately.
- Ceiling section with strand drop
- Mock-up of a joint and free edge
- Access panels and fitting positions
Localities in Shi Yomi district
Use the nearest listed locality, or send your village and a map pin if your site is elsewhere in Shi Yomi district.
- Besang
- Lungte
- Hirong
- Tatik Karo III
- Barbo
- Nutin
- Lamak
- Kangte
- Pullom
- Saline
- Sejigong
- Yadang
- Jereling
- Tasum
- Geching
- Chengo
- Dechengtung West
- Singbir
- Bomjipanga
- Menying
- Lhalung
- Gapo
- Pak
- Yapik
- Paum
- Hone
- Tato Village
- Tagur
- Lower Heyo
- Charu
Explore Arunachal Pradesh ceiling enquiries for other locations.